ANSI/ASME B16.25
- Categories:PRODUCTION INSPECTION
- Author:
- Origin:
- Time of issue:2019-08-23
- Views:11
(Summary description)
ANSI/ASME B16.25
(Summary description)
- Categories:PRODUCTION INSPECTION
- Author:
- Origin:
- Time of issue:2019-08-23
- Views:11
ANSI/ASME B16.25, Buttwelding Ends
Coverage includes preparation for joints with the following:
-
(a) no backing rings -
(b) split or noncontinuous backing rings -
(c) solid or continuous backing rings -
(d) consumable insert rings -
(e) gas tungsten arc welding (GTAW) of the root pass Details of preparation for any backing ring must be specified when ordering the component.
Scan the QR code to read on your phone
- Telphone- 0317-6689999
- E-mail- zhongran@zrpiping.com
- Address- Yanshan County Industrial Park, Cangzhou City, Hebei Province
- Telphone- 0317-6689999
- E-mail- zhongran@zrpiping.com
- Address- Yanshan County Industrial Park, Cangzhou City, Hebei Province
Copyright:Hebei Zhongran Pipefitting Co., Ltd. 冀ICP备19004948号-6